Done more miles in the phase 1 in the last 2 months than about the last 5 years combined, I reckon!
Will probably be tucked away before the end of the month before the roads get too horrid. Knocked a lot of jobs off the list over the last couple of months that I've had it with me in Surrey rather than down in Somerset. Few more I'd like to sort, like the interior heater fan that doesn't spin, putting a working cat1 alarm on it and some minor trim tidying. It's had new fuel lines, cambelt, thermostat, fuel tank level sender, gear shift linkage, FNS window mechanism and motor, lower ball joints, handbrake switch, oil change, accumulator sphere.
Pick it up from having a stainless exhaust, hopefully tomorrow, and will look to get the subframes refinished and all the related items in the spring. The front height corrector is playing up so that'll be overhauled at the same time. Will probably get the spare bumpers painted too
